Where the 60% saving in factory building actually comes from

Weather, waste, repeated site visits and stacked margins, line by line.

By Reflecta ResearchAug 25, 20264 min read
Where the 60% saving in factory building actually comes from
Key takeaways
—Site labour and contractor margin are the biggest costs removed.
—Shipping is the one line that goes up.
—Speed is a saving too: months of carrying cost disappear.

The line, not the site

Building indoors on a fixed schedule removes weather delays, repeated mobilisation and most on-site labour.

No stacked margins

A site build pays each subcontractor and a general contractor on top. One factory contract removes those layers.

The trade-off: shipping

Shipping adds $5,000 to $10,000 depending on the home size. It is the one cost a site build does not have, and it is small beside what is saved.

Enjoying this? Get one like it every Tuesday.

Strategies, market insight and opportunities in 5 minutes a week.

Frequently asked questions

Is a factory-built home lower quality?

No. Indoor, repeatable construction usually means tighter tolerances and fewer defects than a site build.

The Reflecta list
$500
off your Reflecta
Delivered worldwide in 90 days$500 reservation, fully refundableUp to 60% below a site-built home
Step 1 of 2

What would you build?

Pick one. We will send the price sheet for it with your $500 credit.